When you think about who is going to be hit the hardest by pollution, whether it’s conventional air water and soil pollution or climate change, it is very often low-income communities and communities of color. The undercutting of these kinds of protections is going to have a disproportionate impact on these very same communities.
See this page in the PDF
Department of Energy and Related Commissions
weapons development and government-sponsored nuclear energy research.”®* Its cleanup program is the world’s largest, and EM reports that 92 (of 107) sites have been completed.*®
According to the U.S. Government Accountability Office, “DOE is responsible for the largest share of the federal government’s environmental liability—about 85 percent in fiscal year 2020.”*’ Since 2011, EM has spent a cumulative total of $63.2 billion, and its liability has grown by $243 billion.** It is currently projected that cleanup will take another 70 years (FY 2022 to FY 2091).® Projected “Low Range” and “High Range” lifecycle costs total slightly less than $652.4 billion and slightly more than $887.2 billion, respectively.”
Needed Reforms
Some states (and contractors), see EM as ajobs program and have little interest in accelerating the cleanup. EM needs to move to an expeditious program with targets for cleanup of sites. The Hanford site in Washington State is a particular challenge. The Tri-Party Agreement (TPA) among DOE, the Environmental Protection Agency, and Washington State’s Department of Ecology has hampered attempts to accelerate and innovate the cleanup. A central challenge at Hanford is the classification of radioactive waste. High-Level Waste (HLW) and Low-Level Waste (LLW) classifications drive the remediation and disposal process. Under President Trump, significant changes in waste classification from HLW to LLW enabled significant progress on remediation. Implementation needs to continue across the complex, particularly at Hanford.
New Policies The next Administration should:
• Accelerate the cleanup. This means that a comprehensive cost projection and schedule reflecting the entire scope of the job should be developed and appropriate reforms should be instituted. To save taxpayers a potential $500 billion over the long run and reduce current risk, a 10-year program to complete all sites by 2035 (except Hanford with a target date of 2060) should be considered. Such a commitment will require increased funding for EM during those accelerated periods. To the extent that funding from the IIJA and IRA cannot be repealed, requests to divert those funds to EM’s cleanup obligations should be considered.
• Fully implement High-Level Waste determination. Fully adopting
the High-Level Waste (HLW) determination across the DOE complex, particularly at Hanford, would allow LLW to be grouted rather than vitrified.
Take Action
Project 2025 - Top Issues
Read Project 2025 on top issues:
Medicare, education, health care, climate change, veterans, energy, birth control, Social Security, overtime, agriculture, mifepristone, Israel, small business, school lunches, disabilities, Supreme Court, abortion, the death penalty, porn, immigration
Dive Deeper
Read the Project 2025 Comics
Comics explaining Project 2025 (https://stopproject2025comic.org/):
"Project 2025 is a detailed plan to shut you up, and shut you out.
Don’t let it do either.
Read on, then vote."
Comics explain Project 2025 by topic: Children. Health care. Voting. Taxes. Climate. Education. And more.
Read Project 2025 in an open, online discussion
Read and discuss Project 2025 - the whole thing
Joyce Vance Columns on Project 2025
Law professor and NBC Legal Analyst Joyce Vance covers Project 2025